Project location: Dongying, Shandong Building scale: 58,218 m² Arched truss, ultra-large span; intelligent manufacturing precision, green innovation. The coal storage shed in Coal Storage and Transport Area No. 2 of the Dongying Mingsheng Railway Logistics Park adopts a 119-meter-span arched steel t
A first-class construction engineering manufacturer tells you: for first- and second-class welds that are required by the design to be fully penetrated, ultrasonic testing shall be used to inspect internal defects. When ultrasonic testing cannot determine the defects, radiographic testing shall be u
This project is constructed on the basis of land reclamation for road building, which presents great construction difficulty and high construction requirements. It covers an area of approximately 50,000 mu. The completed single workshop is 612 meters long with a single span of 48 meters, and the bui