Overview of Water Plant Construction Project: The civil works and installation project of the BOT project for the Xiajin County Water Supply Plant in Shandong Province is located on the middle side of Provincial Highway 315, south of Zhucang, Xiajin County, Dezhou City, Shandong Province. This project includes but is not limited to all engineering contents within the construction drawing scope of the Xiajin County 20,000-ton/day water supply plant (guard room, comprehensive building, primary pump house, chlorination and dosing room, substation, secondary pump house, folded plate flocculation tank, horizontal sedimentation tank, clear water tank, reuse water tank, regulating tank, sludge thickening tank, sludge drying yard, etc.). The project commenced on July 10, 2009, and was completed and accepted on April 20, 2011, achieving the expected quality objectives.
This specification for steel structures consists of 15 chapters, including general provisions, terms, symbols, basic requirements, incoming raw materials and finished products, welding engineering, fastener connection engineering, steel parts and components processing engineering, steel component assembly engineering, steel component pre-assembly engineering, single-story steel structure installation engineering, multi-story and high-rise steel structure installation engineering, steel space frame structure installation engineering, profiled metal sheet engineering, steel structure coating engineering, and acceptance of steel structure subdivisional works. In principle, steel structure engineering is divided into 10 subdivisional works, each of which is covered in a separate chapter.