The ward building project of the Traditional Chinese Medicine Hospital is the first Taishan Cup project in Jiyang District, and has won the provincial-level Structural Cup, provincial-level Civilized Construction Site, municipal-level Structural Cup, municipal-level Civilized Construction Site, Quancheng Cup, and Taishan Cup
Hospital building construction: The ward building project of Jiyang County Traditional Chinese Medicine Hospital is located in the courtyard of the Traditional Chinese Medicine Hospital, north of Weiyi Road and south of Wei'er Road. It was invested in and constructed by Jiyang County Traditional Chinese Medicine Hospital, designed by Coal Industry Jinan Design and Research Institute Co., Ltd., surveyed by Shandong Zhongcheng Construction Project Management Co., Ltd., and supervised by Jinan Zhongjian Architectural Design Institute Co., Ltd. The project has a building area of 33,029.69 square meters and a total cost of approximately 220 million yuan. The building height is 79.8 meters, with an east-west length of 62.94 meters and a north-south length of 35.74 meters. There is one basement level underground and 19 above-ground floors; it is a Class II high-rise building. Structural form: frame-shear wall structure. Foundation type: cast-in-place pile caps and locally piled raft foundation.






