What problems may be encountered during steel structure construction?

2026-08-26

Steel structures have their own advantages: 1. They greatly save construction time and are not affected by seasons; 2. They increase the usable area of residential spaces, reduce construction waste and environmental pollution; 3. The reuse of building materials can promote the development of other industries; 4. They have good seismic performance, are convenient and flexible to use, and can bring comfort to people. They are widely used in modern buildings such as bridges, industrial plants, and high-rise buildings. During the extensive process of steel structure engineering, many common quality problems have also been exposed.

During the construction of steel structure engineering, the plates used for portal frames may be very thin, and 4 mm can be used. For multi-plate blanking, shearing should be chosen to avoid flame cutting, as flame cutting can cause significant wave deformation at the plate edges. Currently, most H-beam welding uses submerged arc automatic welding or semi-automatic welding. If not properly controlled, welding deformation may occur, causing the components to bend or twist.

Zhongru Kexinda

Before hoisting steel structures, the foundation elevation should be strictly controlled and accurately measured, and the foundation surface should be carefully leveled based on the measurement values; if the secondary grouting method is used, grouting holes (as vent holes) should be opened on the column base plate, the unevenness at the bottom of the steel column should be leveled with steel shims, and the column base support steel plate should be installed in advance according to the design elevation, followed by secondary grouting. Pre-control measures for displacement of steel structure steel columns: Before pouring the concrete foundation, the embedded bolts should be clamped with a fixed chuck according to the design position to prevent displacement during concrete pouring; the reserved holes in the column base plate should be enlarged, and the reserved holes should be made after determining the hole positions. Pre-control measures for excessive vertical deviation of columns: Steel columns should be hoisted in place according to the calculated lifting points, using a lifting method with two or more points. Temporary fixation should be applied during hoisting to prevent deformation; after the column is in place, temporary supports should be added promptly; vertical deviation should be corrected before fixation.

During the construction process, we also need to pay attention to severity. If it affects construction, it can also cause accidents such as collapse and fracture. The variability of steel structures is also very strong. With the extension of external time and the influence of various harsh environments, the quality of steel structures will gradually change. Once the construction time of a steel structure building exceeds 5 years, maintenance is required. In addition, steel structures can also undergo brittle fracture at low temperatures.