A construction engineering construction contract is a legal document that protects the rights and obligations of the employer and the contractor in accordance with the law, and it serves as the highest code of conduct for the employer and the contractor during the construction of the project. To prevent contract disputes, what matters should we pay attention to when signing the contract? Let's take a look together.
I. Regarding the Employer and the Contractor
1. The employer needs to satisfy two aspects: ① Subject qualification, that is, whether the relevant construction procedures are complete. For example: Has the construction land been approved? Has it been included in the investment plan? Have the planning and design been approved? Has bidding been conducted, etc. ② Performance capability, that is, the funding issue. Whether the funds required for construction have been secured or can be secured, etc.
2. The contractor needs to satisfy the following: ① Qualification status; ② Construction capability; ③ Social reputation; ④ Financial condition. The contractor's second-level companies and engineering departments are not allowed to sign contracts externally. The above contents are indicators reflecting performance capability and should be carefully analyzed and judged.
II. Matters to Note Regarding the Contract Price
1. The filling of the “contract price” should be based on the regulations of the Ministry of Housing and Urban-Rural Development. For tendered projects, the contract price shall be agreed upon in the agreement by the employer and the contractor based on the winning bid price in the notice of award. For non-tendered projects, the contract price shall be agreed upon in the agreement by the employer and the contractor based on the project budget.

2. The contract price is a clause jointly agreed upon by both parties, and it must be agreed upon and determined. Provisional prices, provisional estimates, and budgetary estimates cannot be used as the contract price. A cost that is agreed upon but not determined cannot be used as the contract price.
III. Matters to Note Regarding the Clauses on the Employer's Work and the Contractor's Work
1. The specific times for each party's respective work should be filled in accurately.
2. The specific contents and requirements of the work done by each party should be filled in detail.
3. The scope of losses, specific liabilities, and calculation methods for compensation to the other party when either side fails to complete relevant work as agreed must be clearly stated.
IV. Contract Price and Price Adjustments — Points to Note
1. When filling in the contract price and adjustments, choose one of the three methods listed in the General Terms — fixed price, adjustable price, or cost-plus-fee — and specify it in this clause.
2. When adopting a fixed price, be sure to clearly define the type of lump-sum price, such as a total lump-sum price, unit lump-sum price, or partial total lump-sum price, to avoid disputes during contract performance.
3. When adopting a fixed price, the scope of risks must be clearly defined.
4. The calculation method for risk costs should be clearly agreed upon. Both parties should agree on a percentage coefficient.
5. For risk costs beyond the defined risk scope, the adjustment method should be agreed upon.